
Simrad ITI
4
857-164777 / A
The figure above shows that the trawl is 3_ off port side. The doors
and the clump are not lined up correc tly with door/clump di stances
of 28 and 30 meter. The distances to the trawl doors are 310 and
309 meter and distance to the clump is 307 meters. In order to
obtain maximum door spread and a square tow, the middle wire
should be paid out 1.3 m eter.
Note The trawl geometry is compared to the course over ground showing
94
_
with 90
_
being optimum.
Both trawl heights are 3,2 meter and the Trawl Eye echogra m
shows that the port trawl has good bottom contact but for the
moment, with a few fishes in t he opening. One Catch Sensor i s
mounted on the port cod end. The trawl is 6:20 min. behind the
vessel, the clump has a light bottom contact ascending 0,4 m/min.
Depth below the vessel is 120 meter and the temperature at the
trawl is 5,8_ C. In addition, heading, speed and Lat./Long. are
displayed.
The ITI Geometry for Twin Rig will be implemented in the ITI
topside software, version 5.20 or above.
(Cd6 893)
The picture shows a Twin Rig trawl with the Trawl Eye e chogram
showing the trawl opening.
Comments to this Manuals