Simrad SH90 - PRODUCT DESCRIPTION REV A Specifications Page 68

  • Download
  • Add to my manuals
  • Print
  • Page
    / 122
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 67
IS15 General Manual
66 20220760L
6.6 Cabling
Figure 6-5 Interconnection – Principle diagram
Choosing the Cable Routes
After you have decided on the system and mounted the
components of the IS15 System, the next step is to route the
cables between the various parts of the system and to the power
supply. Choose the most direct paths while avoiding the
following hazards:
Sharp bends or kinks in the cable
Hot surfaces (exhaust manifolds or cooking equipment)
Rotating or reciprocating equipment
Sharp or abrasive surfaces
Door and window jambs
Corrosive fluids or gases
Total length of Roblink cables
The IS15 Transceiver can drive a total of 7 instrument heads.
They can be connected in one single “daisy chain” with the
Transceiver in one end, or in two chains with the Transceiver as
a link. The total length of all interconnecting Roblink cables
should not exceed 30 m as shown on Figure 6-6.
Note ! The length of the masthead cables shall not be included in the
above.
Page view 67
1 2 ... 63 64 65 66 67 68 69 70 71 72 73 ... 121 122

Comments to this Manuals

No comments