Simrad SH90 - PRODUCT DESCRIPTION REV A Specifications Page 91

  • Download
  • Add to my manuals
  • Print
  • Page
    / 122
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 90
Setting-Up
20220760L 89
7 SETTING-UP
7.1 First time turn on
Note ! Always turn on all NMEA “listeners” and “talkers” connected
to the system before the first time you turn on the IS15 system.
This includes turn on after a COMMUNICATION RESET or a
MASTER RESET. The system will then automatically configure
the IS15 NMEA ports as talkers (NMEA out) or listeners (NMEA
in).
Before leaving the factory a Master Reset has been performed on
all instruments. The first time power is applied to an instrument,
the display will prompt you to press the illumination key.
IS15 Combi IS15 Multi
To assign an instrument to a system, press the
button. In a
multiple instrument system the instruments are assigned and
given an Id number in the same sequence as the
buttons are
pressed. The instrument that is assigned as #1 will be the master
unit and broadcast common set-up information on the Roblink to
the other instruments.
Notes !
1. When assigning more than one instrument to a system, allow
an interval between each assignment, while the instruments
read “Please Wait”.
2. With an Expander in the system this will always have Id no.
1, i.e the first instrument to be assigned will then be Id no. 2.
After having assigned all instruments in the system, turn the
power Off and then On (the instruments will display POWER
OFF [P.OFF] if you forget). The system will now display the
start-up screens.
IS15 Combi IS15 Multi
Page view 90
1 2 ... 86 87 88 89 90 91 92 93 94 95 96 ... 121 122

Comments to this Manuals

No comments